• undefined
undefined
+

DF-03 Finished parts and components

The precautions for road roller parts mainly include the following aspects:
  • Commodity name: DF-03 Finished parts and components

KEYWORDS:

  • Product Description
  • The precautions for road roller parts mainly include the following aspects:

    Preparation before operation: Before starting the road roller, a comprehensive safety inspection is required, including checking the operating status of key components such as the engine, transmission system, hydraulic system, braking system, steering system and working device. Ensure that all parts are running normally, with no oil, water or air leakage, no loosening of fasteners, and normal air pressure in tires or steel wheels.

    Daily maintenance: After the daily work is completed, dust and oil should be removed from the roller, the fastening parts of each connecting part should be checked for looseness, the tire air pressure should be checked for normal, and the bearings should be heated. These inspection and maintenance measures help to extend the service life of the roller and ensure its performance.

    Transmission maintenance: check the transmission oil level to ensure that it is within the proper range. Change the transmission oil regularly to avoid equipment damage caused by oil quality problems. At the same time, pay attention to the heat dissipation of the gearbox to avoid failure due to overheating.

    Safe operation: the operator should wear personal protective equipment such as safety helmet, reflective undershirt, safety shoes and protective gloves. Before starting the roller, check that there are no obstacles and safety hazards around the machine, and sound the horn as a warning when starting to ensure the safety of the surrounding personnel.

Plant Environment

图片名称

Factory Display


Located at No. 6 Yantai Middle Road, Juxian Economic Development Zone, covering an area of 65 acres, it was registered and established in June 2017 with a registered capital of 5 million yuan. The legal representative is Guo Zongqin, and there are currently 80 employees, including 2 senior professional and technical titles, 3 intermediate professional and technical titles, and 5 junior professional and technical titles.

图片名称
图片名称
图片名称
图片名称
图片名称
图片名称
READ MORE ⟶

Production Process


图片名称

WHY CHOOSE US

Shandong Minghe Engineering Machinery Co., Ltd

The company has 9 departments (General Manager's Office, Enterprise Office, Finance Department, Production Department, Supply Department, Sales Department, Safety and Environmental Protection Office, Quality Department, Warehouse) and 4 production workshops (Steel Casting Workshop, Machining Workshop, Heat Treatment Workshop, and Cleaning Workshop). The main production equipment includes 3 sets of 1.5-ton medium frequency induction furnaces, 1 set of 0.75 ton medium frequency induction furnace, 1 set of 5T and 10T heat treatment resistance furnaces, 1 set of V-casting production line, and more than 20 various machining lathes, drilling machines, boring machines, and milling machines. The company has an advanced laboratory with complete laboratory equipment, newly invested flaw detection equipment, and advanced chemical analysis instrument spectrometers to provide quality assurance for casting products.

production environment

production environment

production environment

production environment

production environment

production environment

production environment

production environment

Product inquiry

Note: Please leave your mobile phone and email address, our professionals will contact you as soon as possible!

Send Us a Message

Main Features* Note: Please be sure to fill in the information accurately and keep communication open, we will get in touch with you as soon as possible

Submission